Start with what the customer will accept, before naming the technology

Korea's SME Strategic Technology Roadmap for 2026–2028 lists advanced manufacturing software and advanced manufacturing infrastructure separately.[1] That distinction can help structure a business plan, but whether a product is software or equipment is not enough to choose a first business opportunity. Ask what problem the customer will confirm has been solved before paying.

This article proposes a practical way to define the scope of an offering. Manufacturing software starts with an output that changes a customer's decisions or work, such as production planning, quality assessment or work history. Production infrastructure starts with the conditions that allow those outputs to be produced: equipment, sensors, communications and data connections that work together. One solution can provide both; there is no need to classify an entire company or product exclusively as one or the other.

NIST's Digital Thread for Manufacturing research addresses connections between design, manufacturing and quality information, as well as consistency in the meaning of that information.[2] Having a connection device and having different systems refer to the same product or process are separate things to verify.

Compare three delivery scopes in the first proposal

The table below is IRUMJAE's proposed comparison for an initial meeting. The roles are examples; confirm the actual budget owner and acceptance reviewer with the customer. Alongside equipment prices and software fees, record who remains responsible for what after installation.

Compare three delivery scopes in the first proposal · Decision table
Delivery scopeWhat the customer acceptsExample of a person to consultAcceptance and operating questions
Manufacturing softwareDefined work outputs, such as work orders, quality assessments or production historyProduction management or quality leadWhat will be compared with the existing workflow, and who will correct exceptions and errors?
Production infrastructureAn operating foundation for equipment connections, data collection, storage and recoveryEquipment or information systems leadHow will missing data and communication interruptions be detected, and who pays for recovery or replacement?
Combined offeringThe connection foundation and the work functions running on itLeads for both areas and the budget ownerSeparate acceptance checks for connections from acceptance checks for work outputs, and define how much integration with additional equipment is included.

Hypothetical case: connect equipment and batches before building a dashboard

Consider this hypothetical example. A metal parts factory wants a dashboard showing why equipment stops. However, equipment timestamps differ from those in the production log, and collected signals cannot be linked to a production batch. Delivering root-cause analysis at the same time would make it difficult to distinguish data connection problems from errors in the analysis function.

Narrow the first project to linking one machine's running and stopped states to batch identifiers. Agree with the customer on how to check for missing records, duplicates and timestamp differences, and leave ambiguous records marked as unverified. Once the connections have passed acceptance checks, compare manual and software summaries using the same records. Do not include a claim of automatically identifying stoppage causes in the results of this connection test.

NIST's OT security guidance explains that systems connected to production equipment require consideration of reliability and safety as well as performance.[3] Agree on when to connect to real equipment, who authorizes the work and how recovery will be handled under the customer's operating rules. Do not expand a defined data connection test into an equipment control test.

Separate development costs from recurring operating costs

In the quotation preparation sheet, separate initial installation and integration costs from costs that recur after delivery. Specify which category covers changes to equipment connections, data retention, account management, error handling, software updates and site visits. Leave unverified integration targets for a site survey rather than promising that they are already included.

If the desired output is clear but input data is insufficient, consider the connection foundation first. If the necessary data is already available, compare whether the work function alone can solve the problem before adding equipment. End the first proposal by distinguishing functions reusable at another factory from settings specific to this site. That distinction helps assess further development work and maintenance costs.

Next steps

To discuss a first manufacturing development or pilot project, send IRUMJAE a non-confidential outline of the process, the customer's desired work outputs, equipment and data currently available for connection, and the person responsible for acceptance.

Sources & further reading

Sources checked · 2026-11-02

[1] TIPA · Korea's SME Strategic Technology Roadmap 2026–2028, public advanced manufacturing category list (Korean)

[2] NIST · Digital Thread for Manufacturing, information connections and semantic conformance

[3] NIST SP 800-82 Rev. 3 · Guide to Operational Technology Security, 2023 final publication