Before starting joint R&D, specify who receives which inputs and what they must deliver. A partner’s output should be usable in the next partner’s fabrication or testing work. This makes the development schedule easier to define.
Ⅰ Check the call and the working plan separately
Korea’s 2026 general commercialization-stage Sanhakyeon Collabo R&D call invited participation by SMEs, universities and research institutions. Its application period, 26 January–12 February 2026, has ended. We use it as a preparation example; check the applicable detailed call, amendments and forms before applying.[1]
The responsibility table below is IRUMJAE’s preparation proposal. Check institutional eligibility, roles under the funding agreement and official submission documents separately.
Ⅱ Define tasks through deliverables and handover conditions
Divide the work into design, fabrication, testing and field deployment. Record the responsible partner, required inputs, completed deliverables and handover date. For prototype development, specify which drawings, component lists, control software and fabrication specifications will be supplied. Include formats, versions and the condition needed for testing.
| Task | Handover deliverables | Next check |
|---|---|---|
| Design | Drawings, design conditions and revision history | Fabrication team review and agreed version |
| Testing | Procedure, raw data and results report | Match specimens and decision method |
| Field deployment | Installation, operation and maintenance records | Field owner and review schedule |
If the table is wider than the screen, scroll horizontally to view it.
Add the responsible organization and handover date to each row. Reflect equipment bookings, sample transport and possible retesting in upstream schedules.
Ⅲ Connect technical and patent information to development questions
List the existing technology, drawings, software and test records each partner will provide. Separate these from documents to be produced during development. Patent information can help identify technical configurations for review; request specifications and test evidence for the actual implementation separately.
Record the permitted scope of sharing, missing information and the person responsible for further checks. This inventory and task table do not determine inventorship, ownership or freedom to operate. Filing responsibility, permissions and contract terms require separate professional review of the original documents.
Ⅳ Assign commercialization work beyond development
Passing a test may still leave production changes, cost verification, installation and maintenance to complete. Connect customer operating conditions, further field validation, production responsibility, deployment costs and timing to the table. Distinguish expected demand from confirmed orders.
For a hypothetical sensor module, separate the handover of laboratory accuracy results from installation and communication tests at the customer’s site. This example is not an actual performance result or client engagement. Give unresolved items an owner and due date for the next discussion.
Related I2B guide on ownership and contract review preparation in Korean
Prepare for a discussion with IRUMJAE
Share a public product outline, proposed partner tasks, the current development stage and target schedule. We can review how responsibilities connect to deliverables, verification and commercialization preparation. Agree on a transfer method before sending confidential technology or contract documents.
Source and scope
Checked 23 October 2026. The official call supports the historical participation notice and closed application period. The table and workflow are our preparation proposals, not official forms or legal determinations of rights.