After selecting a suitable roadmap item, ask what you will need to establish when the project ends. Directions such as higher speed, greater intelligence or better efficiency do not, on their own, define completion. Show how the original target becomes a company requirement and what will demonstrate that it has been met.

1. Record the source and the scope of the target

Korea’s SME Technology Roadmap provides direction for near-term technology development toward commercialization by SMEs.[1] Before using it in a company plan, record the report title, edition, item, page and target year. Identify whether the statement concerns an industry direction, a complete product or an enabling technology.

Even a term such as precision can mean different requirements when the object, formula or operating environment differs. If conditions are missing beside a number, check the surrounding text and notes; leave unconfirmed conditions unresolved. Do not present a roadmap target as your company’s existing achievement.

2. Allocate requirements to the company’s development scope

Suppose a roadmap direction concerns the throughput of an entire inspection machine, while your company develops only its image interpretation module. The module cannot take sole responsibility for performance that also depends on transport equipment, cameras and communications. Define its inputs, outputs, interfaces and responsibility first.

NASA’s requirements guidance checks traceability to higher-level expectations, valid assumptions, feasibility and verifiability.[2] As an internal planning practice, keep three questions together: why is this needed, which component or function is responsible, and what would establish compliance?

3. Connect targets, questions and evidence through requirement IDs

The table illustrates a fictional image interpretation module developer. It does not reproduce an actual roadmap target or official application form. The IDs are assigned by the company, and the table is a review framework whose thresholds and conditions still need to be specified.

Fictional example: connecting roadmap directions to company verification items
Reference directionCompany requirementVerification questionLinked evidence
High-speed inspectionREQ-01 · Set a limit for interpretation latencyIs the latency limit met at the agreed image size and load?Input/output timestamps and measurement report
Precise inspectionREQ-02 · Set detection criteria by defect typeAre the agreed criteria met for each defect type?Evaluation dataset list, ground-truth basis and results by type
Integration with field equipmentREQ-03 · Define behavior on communication lossAre errors reported and recovery achieved under the agreed disconnection conditions?Interface specification, fault-injection record and recovery logs

If the table is wider than the screen, scroll horizontally to view it.

REQ-01 could be written as: ‘On the specified hardware and software versions and under the specified input conditions, interpretation latency, using the agreed measurement interval and aggregation method, shall not exceed T.’ Establish T, its unit, the conditions and aggregation method on a justified basis. A statement with these fields unresolved is not a submission-ready performance target.

A requirement may link to several evidence items. If one report covers several requirements, identify the relevant table, page or dataset for each. This makes the evidence easier to locate than a filename alone.

4. Record why targets are adopted, adapted or deferred

Before adopting a target unchanged, check that its object, units, conditions and timing fit the project. For partial application, record the original and revised scope and the reason. Make the reasoning visible: module responsibility, the customer’s operating environment or what the project can verify within its duration.

If current performance has not been measured, mark the baseline as unmeasured and assign an owner and a date for establishing it. Retain deferred targets with reasons and conditions for reconsideration. Distinguish deferring a long-term target from failing a mandatory target of the current project.

5. Select evidence methods that match the claim

NASA describes test, analysis, inspection and demonstration as verification methods.[3] Plan evidence around the claim: measurements for numerical performance, assumptions and models for calculated claims, inspection records for physical or document requirements, and demonstration records for operating procedures. A demonstration video alone does not establish every quantitative performance claim.

Assign a verification owner, required external cooperation and an evidence delivery date to each requirement. For detailed sample sizes, repetitions, measurement conditions and acceptance criteria, see the related guide on designing R&D performance targets and test methods together. The mapping proposed here records which target that test plan is meant to verify.

6. Review connected items when a requirement changes

Changing the input image size or installation environment can affect test conditions, data, schedule and cost as well as the requirement itself. Keep the requirement ID, record the revision, reason and effective date, and review whether previous evidence remains applicable. Keep planned outcomes separate from actual results.

Before submission, identify targets without sources, targets with an unclear scope of responsibility, requirements without verification methods, and evidence that is not linked to an identifiable requirement. Check the applicable program notice, forms and guidance for the actual submission fields and acceptable evidence. Neither this proposed mapping nor NASA’s engineering guidance is itself a mandatory form for a Korean R&D program.

Prepare the targets and their supporting material

Bring the relevant roadmap pages, your development scope, customer requirements, available measurement data and the intended program’s application form. These help define which targets to adopt and what further information needs to be established.

Official sources and review date

Reviewed on 2026-10-24. The roadmap introduction and NASA’s requirements and verification concepts inform this guide. The workflow, mapping table, IDs and example are IRUMJAE’s practical proposals and do not guarantee selection or evaluation outcomes for any program.