Choose one process the customer can change

Korea’s 2026–2028 SME Strategic Technology Roadmap lists industrial decarbonization and resource circulation under climate and energy. To define a first project, identify the plant that supplies the scrap, the processor that converts it into recovered material, and the customer that will actually use it. Each has different incentives and responsibilities.

Suppose a film converter can segregate clean offcuts of a single material. A potential first buyer is a molder that can use the recovered feedstock in a specific product. Before asking purchasing about monthly volumes, ask production which product and machine are available for a trial and which visual defects or other failures would stop the run. Those answers help define the feedstock specification.

Separate material recovered from virgin material displaced

Consider a hypothetical trial. Sorting and processing 100 kg of offcuts yields 80 kg of recovered feedstock meeting the delivery specification. The customer feeds 60 kg into a trial run for one product and holds the remaining 20 kg in stock. Record the 20 kg that did not become in-spec feedstock separately from the 20 kg of usable stock that has yet to enter production.

The measured yield of in-spec feedstock is 80% (80/100). Whether the customer used 60 kg less virgin material is a separate question. Compare virgin inputs under the original and trial formulations for the same number of accepted products. If rejects and rework increase, the quantity fed into the process alone cannot establish virgin-material savings. Exclude unused stock from the trial’s displacement figure.

Agree on three decisions before the trial

IRUMJAE suggests filling in this worksheet at the first meeting. Agree tolerances with the buyer. Where a value is missing, record who will measure it and when.

Agree on three decisions before the trial · Decision table
DecisionEvidence to recordWhat to decide next
Does it meet specification?Material and contaminants by lot, sample and test criteria, number of accepted productsRetest or proceed to the next lot against the specification approved by the customer’s quality lead
Can the customer buy it?Sorting, processing and transport costs per 1 kg of usable feedstock, and the buyer’s delivery price termsDetermine whether the agreed price covers the costs
What is the environmental effect?Virgin input for the same number of accepted products, changes in electricity use and transport, and the previous route for the offcutsStart quantifying reductions once the measurement boundaries align

Assess recovery performance and carbon claims separately

The GHG Protocol for Project Accounting compares emissions under a baseline scenario without the project with emissions under the project and includes significant secondary effects in the assessment boundary. In this example, the result could depend on whether the offcuts were already recycled for another use, the electricity required for reprocessing, and additional transport. This trial alone does not establish a basis for converting 100 kg collected into greenhouse gas reductions.

After the trial, send purchasing the test results for the accepted lot, the actual cost of the trial formulation, and the items to recheck on the next lot. If the material meets the specification but the price does not work, revisit transport distance or sorting costs first. If only the emissions data are missing, the purchase review can continue while you hold back a carbon reduction figure until the data are available.

Next step

To discuss the scope of a first trial with IRUMJAE, describe the process, the available feedstock and the customer’s acceptance criteria using information you can share publicly.