Pre-opening preparation guide · checked 22 November 2026

Who should prepare, and where should they start?

If your process, equipment or inspection business improves a specific battery-cell manufacturing step, first explain how your module would integrate into a pilot production line. Go beyond a sales brochure: connect responsibilities, comparison baselines, the validation site and partners in one role map. The preparation table below is IRUMJAE’s practical recommendation.

Call status and delivery level

The official portal currently shows Forthcoming. The planned opening is 3 December 2026. The deadline is 31 March 2027 at 17:00 Brussels local time (CEST), equivalent to 00:00 KST on 1 April. Recheck any schedule changes and the actual opening in the official portal before submission.

Topic HORIZON-CL5-2027-02-D2-06 concerns lithium-ion and sodium-ion battery-cell production techniques. The expected end-of-project TRL is 6–7; this is not a minimum entry TRL. Define your contribution around line integration and validation.

What should a Korean company check first?

Korea is associated to Horizon Europe Pillar II, providing a general route to participation and direct funding. Topic-specific eligibility, ownership/control and financial conditions still apply; selection and payment are not guaranteed. The usual consortium minimum is three independent legal entities in three different countries: at least one in an EU Member State and two others in different Member States or Associated Countries. This topic restricts participation by entities directly or indirectly controlled by China or by a legal entity established in China. Being established in Korea alone does not establish eligibility.

This topic is an Innovation Action (IA). The general maximum funding rate is 70% of eligible costs, or up to 100% for non-profit legal entities. Confirm the applicable rate, eligible costs and cash contribution under the call and grant agreement. Do not treat the grant as reimbursement of the company’s entire business budget.

Connect process roles to preparation evidence

Question to define your roleEvidence to prepare firstBoundary to agree with partners
Mixing and electrode manufacturing: which step changes?Applicable materials and processing conditions, comparative test plan, input/output listSamples from cell/electrode partners, interfaces and testing responsibility
Assembly and formation: can bottlenecks and quality improve together?Baseline processing time, energy use, defect definitions and measurement boundariesPermitted downtime and responsibility for installation and operation
Inline inspection: how do results feed back into production?Defect categories, decision evidence and methods to check misses and false detectionsInspection-data access, process-control and quality-approval boundaries
Line integration: what changes when switching chemistry?Module diagram and validation items for changeover, cleaning and contamination controlCross-process compatibility, site safety and operating schedule
Commercialisation: can benefits be compared on the same basis?Cost, energy and environmental-assessment boundaries and underlying data inventoryEquipment supply, use of pilot results and validation with later customers

Hypothetical example: a coating-equipment company

Suppose a Korean coating-equipment company approaches a European cell-manufacturing partner. Instead of saying “we have high-performance equipment”, it prepares a one-page map of the electrode to test, baseline process, installation conditions and measurement owners. Mark unconfirmed samples or pilot-line access as planned, and separately verify the partner’s willingness and availability. This is an illustrative example, not a client track record.

What to prepare now

  1. Describe the process module you would own and the work outside your scope on one page.
  2. Agree with pilot-line operators and cell manufacturers on samples, installation, measurement and data provision.
  3. Separate baseline results from improvement targets, linking test conditions, raw evidence and owners. Do not present targets as achievements.
  4. After opening, compare the final call, forms, eligibility and budget with the role map before deciding whether to submit.

Before contacting IRUMJAE

Prepare a non-confidential company profile, the technology or work you could contribute, existing partners and the evidence available. Initial enquiries need not include confidential customer drawings, process settings or raw operational data. IRUMJAE’s scope, fees and timing are agreed separately.

Official sources and reference date

Reference date: 22 November 2026. Work programme: Commission Decision C(2026) 6687/2, 29 September 2026. The role table, preparation sequence and hypothetical example are IRUMJAE editorial analysis, not an additional official application form or an assurance of selection.