Pre-opening preparation guide · checked 22 November 2026

Does having AI technology mean you are ready?

Developing a model does not by itself establish readiness for an operational pilot. Define the operational problem, the site provider, the data-access route and who approves results. IRUMJAE recommends translating a feature list into a map of responsibilities, evidence and outcomes to discuss with an operator.

Call status and delivery level

The official portal currently shows Forthcoming. The planned opening is 3 December 2026. The deadline is 31 March 2027 at 17:00 Brussels local time (CEST), equivalent to 00:00 KST on 1 April. Recheck any schedule changes and the actual opening in the official portal before submission.

Topic HORIZON-CL5-2027-02-D3-24 concerns operational validation and scaling of energy-sector AI tools and models. The expected end-of-project TRL is 7–8, not a minimum entry TRL. Account for validation at a demonstration site and on an operational grid. The topic covers secure, resource-efficient, open-source (generative) AI, the energy system’s digital spine and digital twin, and edge/federated learning with agent-based architectures. Explain how your contribution fits this scope and check the complete topic requirements.

What should a Korean company check first?

Korea is associated to Horizon Europe Pillar II, providing a general route to participation and direct funding. Topic-specific eligibility, ownership/control and financial conditions still apply; selection and payment are not guaranteed. The usual consortium minimum is three independent legal entities in three different countries: at least one in an EU Member State and two others in different Member States or Associated Countries. This topic restricts participation by entities directly or indirectly controlled by China or by a legal entity established in China. Being established in Korea alone does not establish eligibility.

This topic is an Innovation Action (IA). The general maximum funding rate is 70% of eligible costs, or up to 100% for non-profit legal entities. Confirm the applicable rate, eligible costs and cash contribution under the call and grant agreement. Do not treat the grant as reimbursement of the company’s entire business budget.

Agree roles and evidence with the operator first

Question to define your roleEvidence to prepare firstBoundary to agree with partners
Operational problem: forecasting, anomaly detection or decision support?Use case, current workflow, comparator and designated site contactThe boundary between AI recommendations and the operator’s final decision
Data: can the required records actually be used?Types, periods, resolution, quality, missing-data profile and access availabilityPermissions, secure zones, transfer, retention and deletion responsibilities
Pilot: where and in what sequence will integration occur?Stages for offline testing, limited operation and scale-upFacility access, shutdown/recovery conditions and site approval
Outcomes: does model accuracy improve operations?Metrics against a baseline model or existing operation, measurement period and raw evidenceCalculation boundaries and verification owners for energy/cost effects
Scaling: can another site understand and operate it?Interfaces, updating, monitoring, incident response and handover documentationMaintenance responsibilities of the technology provider, integrator and operator

Hypothetical example: an electricity-demand forecasting model

Suppose a Korean AI company proposes a demand-forecasting model to an energy operator. Instead of sending only research accuracy scores, it includes the data scope, baseline forecasting method, when operators use outputs and the response to a forecast failure. Permission to use test data and authority to control actual equipment must be confirmed separately. This is an illustrative example, not a completed project record.

What to prepare now

  1. Define one operational validation question and separate your AI and integration responsibilities.
  2. Confirm site, data, security and approval owners with the operator and systems integrator.
  3. Prepare a validation table that separates model metrics from operational outcomes. Do not present estimated savings as verified results.
  4. After opening, recheck the final call, forms, consortium, ownership/control and budget conditions against the pilot plan.

Before contacting IRUMJAE

Prepare a non-confidential company profile, the technology or work you could contribute, existing partners and the evidence available. Initial enquiries need not include confidential customer drawings, process settings or raw operational data. IRUMJAE’s scope, fees and timing are agreed separately.

Official sources and reference date

Reference date: 22 November 2026. Work programme: Commission Decision C(2026) 6687/2, 29 September 2026. The role table, preparation sequence and hypothetical example are IRUMJAE editorial analysis, not an additional official application form or an assurance of selection.