Korean companies can participate as funded beneficiaries in EU Horizon Europe. This call requires an international consortium delivering European demonstrations. It is a joint project opportunity. Start by defining the work package, evidence and budget your company can offer an existing proposal team.

Which call is open, and when does it close?

The topic is HORIZON-CL5-2026-11-D3-14. It opened on 4 August 2026 and closes on 1 December 2026 at 17:00 CET, or 2 December at 01:00 KST. Submit through the EU Funding & Tenders Portal. Korea’s Pillar II association enables direct funding, subject to organisation, consortium and topic eligibility.

The general minimum is three mutually independent legal entities in three different countries: at least one in an EU Member State and the others in Member States or Associated Countries. Check General Annex B restrictions, including the general exclusion of China-established entities from Innovation Actions; the granting authority may allow case-by-case exceptions for justified reasons. Additional restrictions on China-controlled entities established in eligible countries require checking the wording of the particular topic.

Separate the funding figures from your own allocation

ItemWhat to check
ScopeChoose either agrivoltaics (agriPV) or offshore/nearshore PV, not both
Demonstration and maturityDemonstrators totalling at least 5 MW across different EU climate/sea zones; target TRL 7–8 at completion
Funding scale€30 million for the topic; indicative EU contribution around €7.5 million per project. These are not the Korean partner’s allocation
InstrumentInnovation Action grant, lump sum. General maximum: 70% for for-profit entities, up to 100% for non-profits; confirm the final agreement

A lump sum remains tied to agreed work and outputs. Build the link between tasks, deliverables and the budget before calculating unfunded costs and your own contribution. A commercialisation plan should explain a credible European application and a route to subsequent deployment.

A preparation sheet to send prospective partners

MaterialQuestion for the first discussion
One-page work packageWhat will we design, supply or test, and what will we deliver?
Performance evidenceDo we have comparison metrics, test conditions, reliability and maintenance evidence?
Site interfacesWho can discuss operations, permits and the grid connection?
Budget and staffHave we separated the consortium budget, our allocation, our contribution and staffing?
Collaboration boundariesHave we distinguished shareable information, confidential technology, background and new outputs?

For agriPV, connect crop and farm-operation comparisons with electricity performance. For offshore/nearshore PV, translate waves, corrosion and maintenance access into work packages. These are IRUMJAE preparation suggestions, not an additional official scoring grid. The topic also requires social sciences and humanities (SSH) contributions: address permitting and community acceptance alongside technical testing. If satellite-based data or services are used, check the Copernicus or Galileo/EGNOS requirement.

Hypothetical example: A Korean developer of corrosion-resistant structures could propose responsibility for degradation testing and maintenance evidence in a nearshore demonstration, supported by existing test data. That is easier to discuss than a general wish to enter Europe. It does not describe an awarded company or an identified consortium recruiting partners.

Frequently asked questions

Is a Korean demonstration site sufficient? The plan must meet this topic’s European demonstration conditions. Korean test results can evidence capability, but a domestic site alone should not be treated as a substitute for the required EU demonstrations.

Can we start finding partners now for this deadline? As of 15 November, roughly two weeks remain. Forming a new team, agreeing sites and completing a joint budget in that period is demanding. Prioritise a defined role in a prepared team; without partners and site evidence, preparing for a future call is more realistic.

Next action and official sources

Choose one application area and prepare one page covering your tasks, test evidence and own contribution for discussion with partners. Transfers of results or exclusive licences may be subject to granting-authority objections for up to four years after the action; connect this separate rights review to the development responsibility table. When contacting IRUMJAE, begin with a non-confidential technology outline and the current partner and demonstration preparation stage.

Information checked: 15 November 2026. Recheck the detailed call and current submission forms before applying.