Overview

Before comparing the size of mobility markets, identify what you will supply, to whom and for use in which equipment. A temperature sensor supplied to an automotive component company, an aircraft replacement part and a sensor integrated into ship equipment may require different evidence and buyers. Choose one intended application instead of trying to meet every sector’s requirements at once.

1. Identify the direct customer and installation point

The vehicle manufacturer, aircraft operator or shipowner may be the end user, while a system integrator, tier-one supplier or equipment maker purchases the item. Record the model and installation location, what the sensor measures and the consequences of failure. Mark unconfirmed demand as an assumption.

1. Identify the direct customer and installation point · Decision table
SectorInitial questionMaterial to prepare
LandWhich vehicle and system will use it, and how are production volumes and change notifications managed?Applicable models, sample and lot records, production and inspection plans
AviationIs it for new production or modification/replacement, and which product and jurisdiction govern the approval route?Part identity, design and production history, intended application
MaritimeWhich ship and equipment will use it, and who handles approval, inspection and maintenance?Vessel and environment, supply scope, inspection and maintenance information

These are discussion prompts, not universal legal procedures. Road and rail applications may also have different requirements.

2. Separate regulatory approval from the customer’s purchase decision

The US Federal Aviation Administration describes PMA as a combined design and production approval for certain modification and replacement articles.[1] It is an example of a US pathway, not a requirement that every aviation supplier obtain its own PMA. Confirm the supply arrangement, eligible product, jurisdiction and responsible party. FAA receiving-inspection guidance also addresses sufficient traceability of parts.[2]

The International Maritime Organization explains that, under applicable international instruments, ship surveys and certificates are generally handled by flag-state administrations or authorized organizations.[3] Whether a particular item requires a separate equipment approval or test depends on the vessel, equipment and applicable rules. Do not assume that IMO directly approves every marine product.

Record required approvals separately from supplier assessment, sample acceptance and purchase contracts. Passing one stage does not automatically complete the others or secure an order.

3. Include responsibilities after delivery

Initial testing costs alone are not enough to assess market entry. Ask how design or material changes must be communicated, which production lots and tests need traceability, and who supplies spare parts and technical support. Retention periods and costs depend on the product, contract and applicable rules; do not insert a universal period without confirmation.

Imagine a sensor maker considering its vehicle product for ship equipment. Existing measurement results are a starting point, but installation, salt and vibration exposure, maintenance access and inspection needs may differ. Before building a sample, it asks the equipment maker to identify the installation point, test environment, evaluation organization and responsible approval party, then estimates extra testing and record-keeping costs. This is a hypothetical illustration, not evidence of demand or approval.

4. Define one entry project

On one page, record the customer and model, component boundary, relevance of existing tests, owner of additional approvals and tests, estimated cost and timing, and conditions for holding the project. Check whether existing relationships and evidence actually fit the chosen application.

Next steps

Contact IRUMJAE with a shareable product overview, target customer and installation point, available test records, and approval or maintenance questions. Applicable rules and approvals require separate product-, jurisdiction- and contract-specific review.

Sources & further reading

Sources checked · 2026-11-07

[1] FAA, PMA

[2] FAA, AC 20-154A

[3] IMO, surveys and certification