Korea’s 2026–2028 SME Technology Roadmap includes semiconductors among its strategic fields.[1] Entering the semiconductor market is still too broad to define a development project. Specify what you will supply, to whom, at which process step and to address which problem, then connect that scope to your technology, people and budget.

1. Locate your direct customer in the supply chain

The Semiconductor Industry Association (SIA) describes the value chain through R&D, design, front-end fabrication and back-end assembly, testing and packaging.[2] Using those stages, identify where your offering fits and whether it is a material, component, piece of equipment, software or service.

Even if a chip manufacturer is the end user, your direct buyer may be an equipment maker or module supplier. Distinguish the users, evaluators and purchasing decision-makers, and establish whose specification governs development. The same component may require different checks in different equipment or processes.

2. Narrow an industry direction to a recurring customer problem

Go beyond broad directions such as better performance or domestic sourcing to investigate recurring issues: variation after cleaning, handling damage or repeated review of inspection results. Establish frequency, consequences, the current workaround and why a customer would evaluate an alternative.

The following fictional examples help frame development candidates. They are not official roadmap targets, confirmed demand from named companies or records of completed projects.

Fictional examples: from supply-chain position to development questions
Direct customer and applicationProblem to establishFirst deliverableEvaluation question to agree
Front-end equipment maker · component cleaningVariation in residual contamination after cleaningCleaning conditions and component samplesCan residual levels and component damage be assessed repeatedly using the agreed measurement method?
Back-end manufacturer · package handlingPositioning error and surface damage during handlingPrototype handling fixtureDoes it meet positioning-error and damage criteria on the target package and equipment?
Test service provider · result reviewDelays in reconciling logs and locating anomaliesLog-alignment and anomaly-highlighting toolDoes it reduce staff review time while controlling omissions and incorrect flags?

If the table is wider than the screen, scroll horizontally to view it.

If the customer has not confirmed the problem, mark the development need as unconfirmed. A growth opportunity described in a public report and a customer’s need for a specific product are different forms of evidence.

3. Record existing capabilities alongside missing conditions

Precision-machining experience does not itself establish suitability for semiconductor contamination controls or the customer’s operating conditions. Separate available equipment, skills and measurements from additional test environments and partners’ responsibilities. Specify what has actually been demonstrated and under which conditions.

For each candidate, check access to customer specifications, reference products and samples, and an identified evaluator and evaluation route. Defer candidates lacking essential conditions, recording why and what would justify reconsideration. Clarify whether your responsibility is component development, process improvement or equipment integration so the scope does not keep expanding.

4. Map the steps between a successful prototype and supply approval

In a 2023 supply-chain article, ASML explained that new suppliers must understand its working practices and quality and delivery requirements.[3] This is one company’s example, not a universal approval process or certification rule. Ask the target customer for its actual evaluation process and required evidence.

Separate internal testing, customer sample evaluation, evaluation in the target equipment or process, and the production-supply decision. Establish samples, acceptance criteria, owners, cost, expected duration and the scope of reassessment after changes at each stage. Do not assume that one certificate or test report replaces every customer’s approval.

Agree on the required control of variation across production runs, lot identification, inspection records and change history. Better component performance in one condition does not establish higher yield across an entire production line. Distinguish evaluated conditions from those still untested to define the purpose of the next trial.

5. Budget for the time and cost of customer evaluation

Beyond prototyping, costs may include cleaning, packaging, transport, test-equipment use, remanufacture, reassessment and on-site support. Separate the development finish date, expected supply approval and expected first order, then assess funding and staffing needs between them. Participation in an evaluation or a sample request is not a confirmed order.

When comparing an expected unit price, include actual manufacturing yield, inspection and rework, minimum batch sizes, inventory and post-delivery support. A low price may not overcome the customer’s switching and evaluation burden. Assess the ability to make a few good samples separately from the ability to meet agreed quality and delivery repeatedly.

6. Define the first project on one page

Record the target customer, process, problem, deliverable, current evidence, customer evaluation and next decision. For a package-handling fixture, first establish the target package and equipment, the positioning error and damage to reduce, the reference fixture, evaluator and acceptance conditions. Leave unknown numbers unresolved and assign an owner and deadline for confirming them.

Bound the initial project to one evaluable process application and deliverable. For detailed verification items, continue with the related guide on turning roadmap targets into R&D verification requirements. This stage produces evidence for the next customer discussion and development decision, rather than a confirmed supply contract.

Prepare your supply-chain position and supporting evidence

Share a publicly disclosable product or process outline, prospective direct customers, existing capabilities and test evidence, the stage confirmed with customers, and your target schedule. These help define development scope and further checks. Agree on the disclosure scope before providing confidential specifications or customer material.

Official sources and review date

Reviewed on 2026-10-24. Sources cover the official roadmap field list, SIA’s value-chain explanation and ASML’s 2023 supply-chain article. Candidate examples, preparation steps and cost considerations are IRUMJAE’s practical proposals. They do not establish a customer’s current purchasing requirements or guarantee supply approval.

[1] Korea SME Technology Roadmap · 2026–2028 strategic fields

[2] SIA · How are Semiconductors Made?

[3] ASML · 6 ingredients of a robust supply chain · 2023-07-17